• العربية
  • فارسی
Brand
  • Iran Insight
  • Politics
  • Economy
  • Analysis
  • Special Report
  • Opinion
  • Podcast
  • Live TV
  • Iran Insight
  • Politics
  • Economy
  • Analysis
  • Special Report
  • Opinion
  • Podcast
  • Live TV
  • Theme
  • Language
    • العربية
    • فارسی
  • Iran Insight
  • Politics
  • Economy
  • Analysis
  • Special Report
  • Opinion
  • Podcast
  • Live TV
All rights reserved for Volant Media UK Limited
volant media logo

Islamabad Temporarily Halts Iran-Pakistan Gas Pipeline

Aug 9, 2023, 12:06 GMT+1
Welders working on a part of Iran-Pakistan pipeline
Welders working on a part of Iran-Pakistan pipeline

Pakistan has put a temporary hold on the ambitious multi-billion-dollar gas pipeline project to import energy from Iran.

According to media reports, the decision appears to be influenced by pressure from the United States, which has imposed sanctions against Iran due to concerns over its nuclear program.

Initially envisioned as a joint endeavor between India, Pakistan and Iran, the gas pipeline project later evolved into a bilateral initiative between Pakistan and Iran after India's withdrawal. However, the implementation of the project has faced setbacks due to the stringent sanctions imposed by the US on Iran.

Citing external factors beyond Islamabad's control, Pakistan issued a notice of 'Force Majeure and Excusing Event' to Iran, thereby suspending its contractual obligations related to the Iran-Pakistan (IP) gas pipeline project. The Dawn newspaper reported that Pakistan conveyed its inability to advance the project as long as US sanctions against Iran remained in effect, or until a signal was received from Washington permitting the project's resumption.

Musadik Malik. Pakistan’s Minister of State for Petroleum, stated, "Pakistan has issued a Force Majeure and Excusing Event notice to Iran under the Gas Sales and Purchase Agreement (GSPA), which resultantly suspends Pakistan's obligations under the GSPA."

Meanwhile, last week during a visit to Pakistan, Iranian Foreign Minister Hossein Amir Abdollahian stressed the project's importance in focusing on regional connectivity, energy cooperation, and enhancing economic and investment partnerships between both countries.

While Tehran continues with the completion of its 1,150-kilometer pipeline segment, Pakistan's section has encountered several setbacks. The project, initiated in 2013 with a USD 7.5 billion estimate, faced a delay as international sanctions hindered Pakistan's commitment to finish by January 2015.

Most Viewed

Iran rules out nuclear concessions even if US accepts Hormuz proposal
1

Iran rules out nuclear concessions even if US accepts Hormuz proposal

2
ANALYSIS

US and Iran want a deal, but neither wants to move first

3

Iran threatens regional air travel as US sanctions cut its flight links

4
INSIGHT

Pezeshkian’s Fox News nuclear overture draws hardline backlash

5
ANALYSIS

Bareheaded mother, veiled daughter: Iran's schools keep a rule its streets have dropped

Banner
Banner

Spotlight

  • Iran’s oil industry has too many masters
    OPINION

    Iran’s oil industry has too many masters

  • Iran wrong to expect midterms to restrain Trump, former US official says

    Iran wrong to expect midterms to restrain Trump, former US official says

  • Trump may be buying time on Iran until after the midterms
    PODCAST

    Trump may be buying time on Iran until after the midterms

  • Pezeshkian’s Fox News nuclear overture draws hardline backlash
    INSIGHT

    Pezeshkian’s Fox News nuclear overture draws hardline backlash

  • US and Iran want a deal, but neither wants to move first
    ANALYSIS

    US and Iran want a deal, but neither wants to move first

  • Rushdie returns to the fatwa that nearly cost him his life

    Rushdie returns to the fatwa that nearly cost him his life

Banner
Banner